1.5 MW Flash Charging Explained
What 1.5 MW Charging Actually Means
A typical US DC fast charger delivers 50-350 kW. Tesla’s V3 Supercharger peaks at 250 kW. BYD’s system is 6x more powerful than a Supercharger and 43x faster than a standard Level 2 charger.
But the real innovation is the architecture. Each station includes an on-site battery buffer charged during off-peak hours at just 100-560 kW from the grid. This eliminates the 12-24 month grid upgrade delays that have crippled US NEVI deployment.
By the Numbers
3x faster than any US charger
223 miles added in 5 min
4,239 already deployed
Technology Behind 1.5 MW
Silicon Carbide Power
SiC power modules handle extreme current without excessive heat. Supports both 500V and 1,000V architectures, auto-adapting to the vehicle’s battery system.
Battery-Buffered Grid
Second-life Blade Battery buffer charges at 100-560 kW off-peak. Eliminates grid upgrade costs—the single biggest bottleneck for US charging deployment.
Zero-Gravity Cable
Overhead T-shaped rail with zero-gravity head slides to either side of the vehicle. Enables pull-through designs for cars with trailers.
CCS Open Standard
Any CCS-compatible EV can use it. Only BYD/Denza with second-gen Blade Battery gets full 1,500 kW speed.
Denza Z9 GT: The First 1.5 MW Vehicle
| Spec | Value |
|---|---|
| Powertrain | Tri-motor, 1,140 bhp (850 kW) |
| 0-62 mph | 2.7 seconds |
| Battery | 122.5 kWh second-gen Blade (LFP) |
| WLTP Range | 372 miles |
| Flash Charging | 10% to 97% in 9 min at 1,500 kW |
| UK Price | ~—100,000-—105,000 |
| UK Launch | Autumn 2026 |
Early UK buyers get 18 months of free Flash Charging—a strategy that mirrors Tesla’s early Supercharger approach.
BYD vs Tesla Supercharging
| Metric | BYD Flash Charging | Tesla Supercharging |
|---|---|---|
| Peak power | 1,500 kW | 250-325 kW |
| 10-80% time | ~5 minutes | ~15-20 minutes |
| Stations (2026) | 20,000 target in China | ~3,000 sites in US |
| Build speed | 20k stations in ~1 year | 14 years for current network |
| Grid approach | Battery-buffered (100-560kW) | Direct grid connection |
| Pricing (UK target) | ~50p/kWh | Varies (~25-50p/kWh) |
| Connector | CCS (open standard) | NACS (proprietary) |
Global Rollout Plan
- China: 20,000 stations by end of 2026 (4,239 by March). 1,000 along highways, every 100 km.
- UK: 200-300 stations by end of 2026, starting at 30-40 Denza dealerships.
- Europe: ~3,000 units by 2027, targeting one Flash Charger every 50 km.
Related Reading
- BYD FLASH Charging: what the 5-minute EV claim really means
- BYD Flash Charging Comes to the UK and Europe
- ChargePoint Express Solo 600kW with Eaton
- China Replaced Its Entire Power Grid in 10 Years